Identity area
Reference code
MT NAM OPM-01-0725/1956
Title
Request for extension of time limit in connection with the removal of bungalows from Mellieha Bay Area -Ghadira- - Bungalow owners
Date(s)
- 16/07/1956 (Creation)
Level of description
Item
Extent and medium
1 paper file
Context area
Name of creator
Archival history
Immediate source of acquisition or transfer
Content and structure area
Scope and content
Appraisal, destruction and scheduling
Accruals
System of arrangement
Conditions of access and use area
Conditions governing access
Conditions governing reproduction
Language of material
- English
Script of material
Language and script notes
Physical characteristics and technical requirements
Condition: good
Finding aids
Allied materials area
Existence and location of originals
Existence and location of copies
Related units of description
POL 3744/1956; PWD2984/1956; MH 1160/1956