File 0390/1968 - Request by Mr. Joseph Gatt for an extension of time licence up to 2a.m. At premises at Qui-Si-Sana, Sliema. -Piper Club-.

Identity area

Reference code

MT NAM OPM-01-1968-0390/1968

Title

Request by Mr. Joseph Gatt for an extension of time licence up to 2a.m. At premises at Qui-Si-Sana, Sliema. -Piper Club-.

Date(s)

  • 27/04/1968 (Creation)

Level of description

File

Extent and medium

1 paper file

Context area

Archival history

Immediate source of acquisition or transfer

Content and structure area

Scope and content

-

Appraisal, destruction and scheduling

Accruals

System of arrangement

Conditions of access and use area

Conditions governing access

Conditions governing reproduction

Language of material

    Script of material

      Language and script notes

      Physical characteristics and technical requirements

      Finding aids

      Allied materials area

      Existence and location of originals

      Existence and location of copies

      Related units of description

      -

      Related descriptions

      Notes area

      Note

      Condition- Good; Language- English

      Alternative identifier(s)

      Access points

      Subject access points

      Place access points

      Name access points

      Genre access points

      Description control area

      Description identifier

      Institution identifier

      Rules and/or conventions used

      Status

      Level of detail

      Dates of creation revision deletion

      Language(s)

        Script(s)

          Sources

          Accession area